Project Overview
This project involved the supply and installation of a 350 Refrigeration Tons (RT) central cooling system for the National Air Navigation located at Airport Road. The implementation features highly efficient, large-scale air-cooled chillers integrated with an expertly insulated, weather-protected chilled water piping network (clad in protective blue jacketing) to ensure optimal climate control and maximum operational reliability for this critical aviation facility.